Maintainability improvement using allocation methods for railway system
DOI:
https://doi.org/10.21014/acta_imeko.v9i1.733Abstract
An optimal maintenance policy is an essential condition of many industrial products in order to save resources and to minimize operational costs and system downtime. Some maintenance actions (e.g.CM, PM and CBM) are illustrated in the first part of the paper. The paper focuses on maintainability allocation techniques: four procedures are analyzed (Failure Rate-based allocation method; Trade-off of failure rate and design feature-based allocation method; Fuzzy maintainability allocation based on interval analysis; Time characteristic-based MA model). The traditional procedures are characterized by several drawbacks; therefore the attention is focalized on the time characteristic-based method, which turned out to be the best and the most complete procedure because it exceeds the others methods limitations. The last part of the paper proposes a case study analyzed using the techniques implemented in the MA optimal method. Two different cases are studied: they differ for the objective Mean Time To Repair, initially the requirement could vary inside a range, then it is fixed to the value 6 hours.Downloads
Published
2020-03-30
Issue
Section
Research Papers
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).